Parker Road Pump Station No. 5
CIP 08-15

The improvements for which bids will be received are described as follows:

The Parker Pump Station project consists of the construction of a sewer pump station, site work including temporary pumping, installation of approximately 430 linear foot of 12-inch PVC and 35 linear feet of 18-inch HDPE gravity sewer pipe, approximately 420 linear foot of 12-inch O.D. SDR 21 HDPE force main pipe, utilities relocation, street overlay, pump station driveway construction, and fence. The Parker Pump Station consists of a 10-foot in diameter wetwell approximately 22 feet deep with two (2) submersible sewage pumps, a valve and meter vault, electrical and telemetry enclosures with shelter, and an outdoor emergency generator set.

The Engineer’s estimated range for this project is between $1,900,000 and $2,000,000. For technical questions, please call Jason Van Gilder, associate city engineer, at 253-299-5703.

Sealed Bids will be received by the City of Sumner in the Office of the City Clerk located on the second floor of Sumner City Hall, 1104 Maple Street, Suite 200, Sumner, Washington 98390-1423, until 2:00 pm on February 2, 2016, as shown on the clock nearest to the desk of the City Clerk. Bids will therefore be opened and publicly read aloud. Bids received after the time fixed for Bid Opening will not be considered.

Click here to link to full Call for Bids notice

Parker Road Bid Tabulation (pdf)