We are asking you to please help us save water. Click here to learn a few simple steps to help keep our water levels safe for consumption and fire suppression.

Rate changes effective October 1, 2021

Permit Base Fee:

  • Commercial/Industrial-$100.00
  • Residential-$50.00

Inspection Fee:

2 hours x Current Inspector Burdened Rate (Minimum)-$150.00
Additional inspection as warranted: # hours x Staff Burdened Rate

Plan Review Fee:

1 hour x Current Engineer Burdened Rate (Minimum)-$110.00
In-house plan review fee + # hours x Current Engineer Burdened Rate
Third-party review fees as billed to City, including City administrative costs

Burdened rate for City staff:

Associate Engineer -$110.00
Engineering Technician -$75.00

System Development Charge

per equivalent service unit (ESU)-$2,707.41

  • singe family residence = 1.0 ESU per unit
  • multi-family residence = 0.8 ESU per unit after 1st unit
  • accessory dwelling units = 0.8 ESU

Single SITE PERMIT

Includes one permit for TESC, grading and filling, and all non-structure site improvements
((# impervious square feet/3,100 sf) x $SDC)

Phased SITE PERMIT

Includes separate TESC permit before the Site Development permit
TESC Phase: (# square feed of disturbed land/1,000) x $20

SITE Phase:

((# impervious square feet/3,100 sf) x $SDC) – $SDC collected during TESC phase

Quick Links

Contact Us

Allison Judge Development Services Coordinator , 253-299-5530

To schedule inspections, please use the online portal. You will use the same login information you used to apply for your permit.

For more information on code issues, please contact the Building Official at 253-299-5530 or buildingofficial@sumnerwa.gov.

Skip to content